Apollo Lunar Module
Manufacturer | Grumman |
---|---|
Designer | Thomas J. Kelly |
Country of origin | United States |
Operator | NASA |
Applications | Crewed lunar landing |
Specifications | |
Spacecraft type | Lunar lander |
Launch mass |
|
Dry mass |
|
Crew capacity | 2 |
Volume | 235 cu ft (6.7 m3) |
Power | 28 V DC, 115 V 400 Hz AC |
Batteries | Six or seven 28–32-volt, 296 ampere hour silver-zinc |
Regime | |
Design life | 75 hours (extended) |
Dimensions | |
Length | 23 ft 1 in (7.04 m) |
Diameter | 13 ft 10 in (4.22 m) without landing gear |
Width | 31 ft (9.4 m), landing gear deployed |
Production | |
Status | Retired |
Built | 15 |
Launched | 10 |
Operational | 10 |
Retired | 1972 |
Failed | 0 |
Lost | 0 |
Maiden launch | January 22, 1968 |
Last launch | December 7, 1972 |
Last retirement | December 14, 1972 |
Related spacecraft | |
Flown with | Apollo Command and Service Module |
Configuration | |
The Apollo Lunar Module (LM /ˈlɛm/), originally designated the Lunar Excursion Module (LEM), was the lunar lander spacecraft that was flown between lunar orbit and the Moon's surface during the United States' Apollo program. It was the first crewed spacecraft to operate exclusively in the airless vacuum of space, and remains the only crewed vehicle to land anywhere beyond Earth.
Structurally and aerodynamically incapable of flight through Earth's atmosphere, the two-stage Lunar Module was ferried to lunar orbit attached to the Apollo command and service module (CSM), about twice its mass. Its crew of two flew the Lunar Module from lunar orbit to the Moon's surface. During takeoff, the spent descent stage was used as a launch pad for the ascent stage which then flew back to the command module, after which it was also discarded.
Overseen by Grumman, the LM's development was plagued with problems that delayed its first uncrewed flight by about ten months and its first crewed flight by about three months. Regardless, the LM became the most reliable component of the Apollo–Saturn space vehicle.[1] The total cost of the LM for development and the units produced was $21.65 billion in 2016 dollars, adjusting from a nominal total of $2.29 billion[2] using the NASA New Start Inflation Indices.[3]
Ten lunar modules were launched into space. Of these, six were landed by humans on the Moon from 1969 to 1972. The first two flown were tests in low Earth orbit: Apollo 5, without a crew; and Apollo 9 with a crew. A third test flight in low lunar orbit was Apollo 10, a dress rehearsal for the first landing, conducted on Apollo 11. The Apollo 13 lunar module functioned as a lifeboat to provide life support and propulsion to keep the crew alive for the trip home, when their CSM was disabled by an oxygen tank explosion en route to the Moon.
The six landed descent stages remain at their landing sites; their corresponding ascent stages crashed into the Moon following use. One ascent stage (Apollo 10's Snoopy) was discarded in a heliocentric orbit after its descent stage was discarded in lunar orbit.[4] The other three LMs were destroyed during controlled re-entry in the Earth's atmosphere: the four stages of Apollo 5 and Apollo 9 each re-entered separately, while Apollo 13's Aquarius re-entered as a unit.
Operational profile
[edit]At launch, the lunar module sat directly beneath the command and service module (CSM) with legs folded, inside the Spacecraft-to-LM adapter (SLA) attached to the S-IVB third stage of the Saturn V rocket. There it remained through Earth parking orbit and the trans-lunar injection (TLI) rocket burn to send the craft toward the Moon.
Soon after TLI, the SLA opened; the CSM performed a maneuver whereby it separated, turned around, came back to dock with the Lunar Module, and extracted it from the S-IVB. During the flight to the Moon, the docking hatches were opened and the Lunar Module pilot entered the LM to power up temporarily and test all systems except propulsion. The Lunar Module pilot performed the role of an engineering officer, monitoring the systems of both spacecraft.
After achieving a lunar parking orbit, the commander and LM pilot entered and powered up the LM, replaced the hatches and docking equipment, unfolded and locked its landing legs, and separated from the CSM, flying independently. The commander operated the flight controls and engine throttle, while the Lunar Module pilot operated other spacecraft systems and kept the commander informed about systems status and navigational information. After the command module pilot visually inspected the landing gear, the LM was withdrawn to a safe distance, then rotated until the descent engine was pointed forward into the direction of travel. A 30-second descent orbit insertion burn was performed to reduce speed and drop the LM's perilune to within about 50,000 feet (15 km) of the surface,[5] about 260 nautical miles (480 km) uprange of the landing site.
As the craft approached perilune, the descent engine was started again to begin powered descent. During this time, the crew flew on their backs, depending on the computer to slow the craft's forward and vertical velocity to near zero. Control was exercised with a combination of engine throttling and attitude thrusters, guided by the computer with the aid of landing radar. During braking, the LM descended to about 10,000 feet (3.0 km), then, in the final approach phase, down to about 700 feet (210 m). During final approach, the vehicle pitched over to a near-vertical position, allowing the crew to look forward and down to see the lunar surface for the first time.[6]
Astronauts flew Apollo spacecraft manually only during the lunar approach.[7] The final landing phase began about 2,000 feet (0.61 km) uprange of the targeted landing site. At this point, manual control was enabled for the commander, who had enough propellant to hover for up to two minutes to survey where the computer was taking the craft and make any necessary corrections. If necessary, landing could have been aborted at almost any time by jettisoning the descent stage and firing the ascent engine to climb back into orbit for an emergency return to the CSM. Finally, one or more of three 67.2-inch (1.71 m) probes extending from footpads on the legs of the lander touched the surface, activating the contact indicator light which signaled the commander to shut off the descent engine, allowing the LM to settle onto the surface. On touchdown, the probes would be bent as much as 180 degrees, or even break off. The original design used the probes on all four legs, but starting with the first landing (LM-5 on Apollo 11), the one at the ladder was removed out of concern that the bent probe after landing might puncture an astronaut's suit as he descended or stepped off the ladder.
The original extravehicular activity plan, up through at least 1966, was for only one astronaut to leave the LM while the other remained inside "to maintain communications".[8] Communications were eventually deemed to be reliable enough to allow both crew members to walk on the surface, leaving the spacecraft to be only remotely attended by Mission Control.
Beginning with Apollo 14, extra LM propellant was made available for the powered descent and landing, by using the CSM engine to achieve the 50,000-foot (15 km) perilune. After the spacecraft undocked, the CSM raised and circularized its orbit for the remainder of the mission.
When ready to leave the Moon, the LM's ascent engine fired, leaving the descent stage on the Moon's surface. After a few course correction burns, the LM rendezvoused with the CSM and docked to transfer the crew and rock samples. Having completed its job, the ascent stage was separated. The Apollo 10 ascent stage engine was fired until its fuel was used up, sending it past the Moon into a heliocentric orbit.[9][10] The Apollo 11 ascent stage was left in lunar orbit to eventually crash; all subsequent ascent stages (except for Apollo 13) were intentionally steered into the Moon to obtain readings from seismometers placed on the surface.[11]
History
[edit]The Lunar Module (originally designated the Lunar Excursion Module, known by the acronym LEM) was designed after NASA chose to reach the Moon via Lunar Orbit Rendezvous (LOR) instead of the direct ascent or Earth Orbit Rendezvous (EOR) methods. Both direct ascent and EOR would have involved landing a much heavier, complete Apollo spacecraft on the Moon. Once the decision had been made to proceed using LOR, it became necessary to produce a separate craft capable of reaching the lunar surface and ascending back to lunar orbit.
Contract letting and construction location
[edit]In July 1962, eleven firms were invited to submit proposals for the LEM. Nine companies responded in September, answering 20 questions posed by the NASA RFP in a 60-page limited technical proposal. Grumman was awarded the contract officially on November 7, 1962.[12] Grumman had begun lunar orbit rendezvous studies in the late 1950s and again in 1961. The contract cost was expected to be around $350 million.[13] There were initially four major subcontractors: Bell Aerosystems (ascent engine), Hamilton Standard (environmental control systems), Marquardt (reaction control system) and Rocketdyne (descent engine).[14]
The Primary Guidance, Navigation and Control System (PGNCS) was developed by the MIT Instrumentation Laboratory; the Apollo Guidance Computer was manufactured by Raytheon (a similar guidance system was used in the command module). A backup navigation tool, the Abort Guidance System (AGS), was developed by TRW. The landing gear was manufactured by Héroux.[15]
The Apollo Lunar Module was assembled in a Grumman factory in Bethpage, New York.[16][17]
Design phase
[edit]The Apollo Lunar Module was chiefly designed by Grumman aerospace engineer Thomas J. Kelly.[18] The first LEM design looked like a smaller version of the Apollo command and service module (a cone-shaped cabin atop a cylindrical propulsion section) with folding legs. The second design invoked the idea of a helicopter cockpit with large curved windows and seats, to improve the astronauts' visibility for hover and landing. This also included a second, forward docking port, allowing the LEM crew to take an active role in docking with the CSM.
As the program continued, there were numerous redesigns to save weight, improve safety, and fix problems. First to go were the heavy cockpit windows and the seats; the astronauts would stand while flying the LEM, supported by a cable and pulley system, with smaller triangular windows giving them sufficient visibility of the landing site. Later, the redundant forward docking port was removed, which meant the Command Pilot gave up active control of the docking to the Command Module Pilot; he could still see the approaching CSM through a small overhead window. Egress while wearing bulky extra-vehicular activity spacesuits was eased by a simpler forward hatch (32 in × 32 in or 810 mm × 810 mm).
The configuration was frozen in April 1963, when the ascent and descent engine designs were decided. In addition to Rocketdyne, a parallel program for the descent engine[19] was ordered from Space Technology Laboratories (TRW) in July 1963, and by January 1965 the Rocketdyne contract was cancelled.
Power was initially to be produced by fuel cells built by Pratt and Whitney similar to the CSM, but in March 1965 these were discarded in favor of an all-battery design.[20]
The initial design had three landing legs, the lightest possible configuration. But as any particular leg would have to carry the weight of the vehicle if it landed at a significant angle, this was also the least stable configuration if one of the legs were damaged during landing. The next landing gear design iteration had five legs and was the most stable configuration for landing on an unknown terrain. That configuration, however, was too heavy and the designers compromised on four landing legs.[21]
In June 1966, the name was changed to Lunar Module (LM), eliminating the word excursion.[22][23] According to George Low, Manager of the Apollo Spacecraft Program Office, this was because NASA was afraid that the word excursion might lend a frivolous note to Apollo.[24] Despite the name change, the astronauts and other NASA and Grumman personnel continued to pronounce the abbreviation as (/lɛm/) instead of the letters "L-M".
Astronaut training
[edit]Comparing landing on the Moon to "a hovering operation", Gus Grissom said in 1963 that although most early astronauts were fighter pilots, "now we're wondering if the pilot making this first moon landing shouldn't be a highly experienced helicopter pilot".[25] To allow astronauts to learn lunar landing techniques, NASA contracted Bell Aerosystems in 1964 to build the Lunar Landing Research Vehicle (LLRV), which used a gimbal-mounted vertical jet engine to counter five-sixths of its weight to simulate the Moon's gravity, in addition to its own hydrogen peroxide thrusters to simulate the LM's descent engine and attitude control. Successful testing of two LLRV prototypes at the Dryden Flight Research Center led in 1966 to three production Lunar Landing Training Vehicles (LLTV) which along with the LLRV's were used to train the astronauts at the Houston Manned Spacecraft Center. This aircraft proved fairly dangerous to fly, as three of the five were destroyed in crashes. It was equipped with a rocket-powered ejection seat, so in each case the pilot survived, including the first man to walk on the Moon, Neil Armstrong.[26]
Development flights
[edit]LM-1 was built to make the first uncrewed flight for propulsion systems testing, launched into low Earth orbit atop a Saturn IB. This was originally planned for April 1967, to be followed by the first crewed flight later that year. But the LM's development problems had been underestimated, and LM-1's flight was delayed until January 22, 1968, as Apollo 5. At that time, LM-2 was held in reserve in case the LM-1 flight failed, which did not happen.
LM-3 now became the first crewed LM, again to be flown in low Earth orbit to test all the systems, and practice the separation, rendezvous, and docking planned for Apollo 8 in December 1968. But again, last-minute problems delayed its flight until Apollo 9 on March 3, 1969. A second, higher Earth orbit crewed practice flight had been planned to follow LM-3, but this was cancelled to keep the program timeline on track.
Apollo 10 launched on May 18, 1969, using LM-4 for a "dress rehearsal" for the lunar landing, practicing all phases of the mission except powered descent initiation through takeoff. The LM descended to 47,400 feet (9.0 mi; 14.4 km) above the lunar surface, then jettisoned the descent stage and used its ascent engine to return to the CSM.[27]
Production flights
[edit]The first crewed lunar landing occurred on July 20, 1969, in the Apollo 11 LM-5 Eagle. Four days later, the Apollo 11 crew in the command module Columbia splashed down in the Pacific Ocean, completing President John F. Kennedy's goal: "...before this decade is out, of landing a man on the Moon and returning him safely to the Earth".
This was followed by landings by Apollo 12 (LM-6 Intrepid) and Apollo 14 (LM-8 Antares). In April 1970, the Apollo 13 LM-7 Aquarius played an unexpected role in saving the lives of the three astronauts after an oxygen tank in the service module ruptured, disabling the CSM. Aquarius served as a "lifeboat" for the astronauts during their return to Earth. Its descent stage engine[19] was used to replace the crippled CSM Service Propulsion System engine, and its batteries supplied power for the trip home and recharged the Command Module's batteries critical for reentry. The astronauts splashed down safely on April 17, 1970. The LM's systems, designed to support two astronauts for 45 hours (including two depressurization and repressurization cycles, causing loss of oxygen supply), actually stretched to support three astronauts for 90 hours (without pressurization cycles and loss of oxygen).
Hover times were maximized on the last four landing missions by using the Service Module engine to perform the initial descent orbit insertion burn 22 hours before the LM separated from the CSM, a practice begun on Apollo 14. This meant that the complete spacecraft, including the CSM, orbited the Moon with a 9.1-nautical-mile (16.9 km) perilune, enabling the LM to begin its powered descent from that altitude with a full load of descent stage propellant, leaving more reserve propellant for the final approach. The CSM would then raise its perilune back to the normal 60 nautical miles (110 km).[28]
Extended J-class missions
[edit]The Extended Lunar Module (ELM) used on the final three "J-class missions" — Apollo 15, 16, and 17 — was upgraded to land larger payloads and stay longer on the lunar surface. The descent engine thrust was increased by the addition of a 10-inch (250 mm) extension to the engine bell, and the descent propellant tanks were enlarged. A waste storage tank was added to the descent stage, with plumbing from the ascent stage. These upgrades allowed stays of up to 75 hours on the Moon.
The Lunar Roving Vehicle was folded up and carried in Quadrant 1 of the descent stage. It was deployed by the astronauts after landing, allowing them to explore large areas and return a greater variety of lunar samples.
Specifications
[edit]Weights given here are an average for the original pre-ELM spec vehicles. For specific weights for each mission, see the individual mission articles.
Ascent stage
[edit]The ascent stage contained the crew cabin with instrument panels and flight controls. It contained its own Ascent Propulsion System (APS) engine and two hypergolic propellant tanks for return to lunar orbit and rendezvous with the Apollo command and service module. It also contained a Reaction Control System (RCS) for attitude and translation control, which consisted of sixteen hypergolic thrusters similar to those used on the Service Module, mounted in four quads, with their own propellant supply. A forward extravehicular activity hatch provided access to and from the lunar surface, while an overhead hatch and docking port provided access to and from the Command Module.
Internal equipment included an environmental control (life support) system; a VHF communications system with two antennas for communication with the Command Module; a unified S-band system and steerable parabolic dish antenna for communication with Earth; an extravehicular activity antenna resembling a miniature parasol which relayed communications from antennas on the astronauts' Portable Life Support Systems through the LM; primary (PGNCS) and backup (AGS) guidance and navigation systems; an Alignment Optical Telescope for visually determining the spacecraft orientation; rendezvous radar with its own steerable dish antenna; and a system for active thermal control. Electrical storage batteries, cooling water, and breathing oxygen were stored in amounts sufficient for a lunar surface stay of 48 hours initially, extended to 75 hours for the later missions.
During rest periods while parked on the Moon, the crew would sleep on hammocks slung across the cabin.
The return payload included the lunar rock and soil samples collected by the crew (as much as 238 pounds (108 kg) on Apollo 17), plus their exposed photographic film.
- Crew: 2
- Crew cabin volume: 235 cu ft (6.7 m3)
- Habitable volume: 160 cu ft (4.5 m3)
- Crew compartment height: 7 ft 8 in (2.34 m)
- Crew compartment depth: 3 ft 6 in (1.07 m)
- Height: 9 ft 3.5 in (2.832 m)
- Width: 14 ft 1 in (4.29 m)
- Depth: 13 ft 3 in (4.04 m)
- Mass, dry: 4,740 lb (2,150 kg)
- Mass, gross: 10,300 lb (4,700 kg)
- Atmosphere: 100% oxygen at 4.8 psi (33 kPa)
- Water: two 42.5 lb (19.3 kg) storage tanks
- Coolant: 25 pounds (11 kg) of ethylene glycol / water solution
- Thermal Control: one active water-ice sublimator
- RCS propellant mass: 633 lb (287 kg)
- RCS thrusters: Sixteen x 100 lbf (440 N) in four quads
- RCS propellants: Aerozine 50 fuel / Dinitrogen tetroxide (N2O4) oxidizer
- RCS specific impulse: 290 s (2.8 km/s)
- APS propellant mass: 5,187 lb (2,353 kg) stored in two 36-cubic-foot (1.02 m3) propellant tanks
- APS engine: Bell Aerospace LM Ascent Engine (LMAE) and Rocketdyne LMAE Injectors
- APS thrust: 3,500 lbf (16,000 N)
- APS propellants: Aerozine 50 fuel / Dinitrogen Tetroxide oxidizer
- APS pressurant: Two 6.4 lb (2.9 kg) helium tanks at 3,000 pounds per square inch (21 MPa)
- APS specific impulse: 311 s (3.05 km/s)
- APS delta-V: 7,280 ft/s (2,220 m/s)
- Thrust-to-weight ratio at liftoff: 2.124 (in lunar gravity)
- Batteries: Two 28–32 volt, 296 ampere hour Silver-zinc batteries; 125 lb (57 kg) each
- Power: 28 V DC, 115 V 400 Hz AC
Descent stage
[edit]The descent stage's primary job was to support a powered landing and surface extravehicular activity. When the excursion was over, it served as the launch pad for the ascent stage. Its octagonal shape was supported by four folding landing gear legs, and contained a throttleable Descent Propulsion System (DPS) engine with four hypergolic propellant tanks. A continuous-wave Doppler radar antenna was mounted by the engine heat shield on the bottom surface, to send altitude and rate of descent data to the guidance system and pilot display during the landing. Almost all external surfaces, except for the top, platform, ladder, descent engine and heat shield, were covered in amber, dark (reddish) amber, black, silver, and yellow aluminized Kapton foil blankets for thermal insulation. The number 1 (front) landing leg had an attached platform (informally known as the "porch") in front of the ascent stage's extravehicular activity hatch and a ladder, which the astronauts used to ascend and descend between the cabin and the surface. The landing pad of each leg incorporated a 67-inch-long (1.7 m) surface contact sensor probe, which signaled the commander to switch off the descent engine. (The probe was omitted from the number 1 leg of every landing mission, to avoid a suit-puncture hazard to the astronauts, as the probes tended to break off and protrude upwards from the surface.)
Equipment for the lunar exploration was carried in the Modular Equipment Stowage Assembly (MESA), a drawer mounted on a hinged panel dropping out of the lefthand forward compartment. Besides the astronaut's surface excavation tools and sample collection boxes, the MESA contained a television camera with a tripod; as the commander opened the MESA by pulling on a lanyard while descending the ladder, the camera was automatically activated to send the first pictures of the astronauts on the surface back to Earth. A United States flag for the astronauts to erect on the surface was carried in a container mounted on the ladder of each landing mission.
The Early Apollo Surface Experiments Package (later the Apollo Lunar Surface Experiments Package), was carried in the opposite compartment behind the LM. An external compartment on the right front panel carried a deployable S-band antenna which, when opened looked like an inverted umbrella on a tripod. This was not used on the first landing due to time constraints, and the fact that acceptable communications were being received using the LM's S-band antenna, but was used on Apollo 12 and 14. A hand-pulled Modular Equipment Transporter (MET), similar in appearance to a golf cart, was carried on Apollo 13 and 14 to facilitate carrying the tools and samples on extended moonwalks. On the extended missions (Apollo 15 and later), the antenna and TV camera were mounted on the Lunar Roving Vehicle, which was carried folded up and mounted on an external panel. Compartments also contained replacement Portable Life Support System (PLSS) batteries and extra lithium hydroxide canisters on the extended missions.
- Height: 10 ft 7.2 in (3.231 m) (plus 5 ft 7.2 in (1.707 m) landing probes)
- Width/depth, minus landing gear: 13 ft 10 in (4.22 m)
- Width/depth, landing gear extended: 31.0 ft (9.4 m)
- Mass including propellant: 22,783 lb (10,334 kg)
- Water: one 151 kg (333 lb) storage tank
- DPS propellant mass: 18,000 lb (8,200 kg) stored in four 67.3-cubic-foot (1.906 m3) propellant tanks
- DPS engine: TRW LM descent engine (LMDE)[29][19]
- DPS thrust: 10,125 lbf (45,040 N), throttleable between 10% and 60% of full thrust
- DPS propellants: Aerozine 50 fuel / nitrogen tetroxide oxidizer
- DPS pressurant: one 49-pound (22 kg) supercritical helium tank at 1,555 psi (10.72 MPa)
- DPS specific impulse: 311 s (3,050 N⋅s/kg)
- DPS delta-V: 8,100 ft/s (2,500 m/s)
- Batteries: four (Apollo 9–14) or five (Apollo 15–17) 28–32 V, 415 A⋅h silver-zinc batteries; 135 lb (61 kg) each
Lunar modules produced
[edit]Serial number | Name | Use | Launch date | Location | Image |
---|---|---|---|---|---|
LTA-1 | Not flown | Cradle of Aviation Museum (Long Island, New York)[30] | |||
LTA-2R | Apollo 6 | April 4, 1968 | Re-entered Earth's atmosphere | ||
LTA-3A | Not flown | Kansas Cosmosphere and Space Center[31] | |||
LTA-3DR | Non-flight descent stage | Franklin Institute[32] | |||
LTA-5D | Not flown | White Sands Test Facility[33] | |||
LTA-8A | Thermal-vacuum tests | Ground tests in 1968 | Space Center Houston[34][35] | ||
LTA-10R | Apollo 4 | November 9, 1967 | Re-entered Earth's atmosphere[34] | ||
MSC-16 | Lunar Module Trainer | Museum of Science and Industry (Chicago)[36] | |||
TM-5 | Non-flight | Museum of Life and Science (Durham, North Carolina)[37] | |||
PA-1 | Not flown | White Sands Test Facility[38] | |||
LM-1 | Apollo 5 | January 22, 1968 | Re-entered Earth's atmosphere | ||
LM-2 | Intended for second uncrewed flight, used instead for ground testing. Landing gear added for drop testing. Lacks Alignment Optical Telescope and flight computer[39] | National Air and Space Museum (Washington, D.C.)[40] | |||
LM-3 | Spider | Apollo 9 | March 3, 1969 | Descent and ascent stages reentered Earth's atmosphere separately | |
LM-4 | Snoopy | Apollo 10 | May 18, 1969 | Descent stage may have hit the Moon, ascent stage in heliocentric orbit. Snoopy is the only flown LM ascent stage known to have survived intact (possibly asteroid 2018 AV2[41]). | |
LM-5 | Eagle | Apollo 11 | July 16, 1969 | Descent stage on lunar surface in Sea of Tranquility, ascent stage left in lunar orbit (could be still orbiting the moon [42]) | |
LM-6 | Intrepid | Apollo 12 | November 14, 1969 | Descent stage on lunar surface at Ocean of Storms, ascent stage deliberately crashed into Moon | |
LM-7 | Aquarius | Apollo 13 | April 11, 1970 | Re-entered Earth's atmosphere | |
LM-8 | Antares | Apollo 14 | January 31, 1971 | Descent stage on lunar surface at Fra Mauro, ascent stage deliberately crashed into Moon | |
LM-9 | Not flown, intended as Apollo 15, last H-class mission | On display at the Kennedy Space Center (Apollo/Saturn V Center)[43] | |||
LM-10 | Falcon | Apollo 15, first ELM | July 26, 1971 | Descent stage on lunar surface at Hadley–Apennine, ascent stage deliberately crashed into Moon | |
LM-11 | Orion | Apollo 16 | April 16, 1972 | Descent stage on lunar surface at Descartes Highlands, ascent stage left in lunar orbit, crashed on Moon | |
LM-12 | Challenger | Apollo 17 | December 7, 1972 | Descent stage on lunar surface at Taurus-Littrow, ascent stage deliberately crashed into Moon | |
LM-13 | Not flown, intended as Apollo 19[44][45] |
Partially completed by Grumman, restored and on display at Cradle of Aviation Museum (Long Island, New York). Also used during 1998 miniseries From the Earth to the Moon.[46] | |||
LM-14 | Not flown, intended as Apollo 20[47] | Incomplete, most likely scrapped[48] | |||
LM-15 | Not flown, intended for modification into Apollo Telescope Mount[49][50] | Incomplete,[48] scrapped[51] | |||
* For the location of LMs left on the Lunar surface, see list of artificial objects on the Moon. |
Proposed derivatives
[edit]Apollo Telescope Mount
[edit]One proposed Apollo application was an orbital solar telescope constructed from a surplus LM with its descent engine replaced with a telescope controlled from the ascent stage cabin, the landing legs removed and four "windmill" solar panels extending from the descent stage quadrants. This would have been launched on an uncrewed Saturn IB, and docked with a crewed command and service module, named the Apollo Telescope Mission (ATM).
This idea was later transferred to the original wet workshop design for the Skylab orbital workshop and renamed the Apollo Telescope Mount to be docked on a side port of the workshop's multiple docking adapter (MDA). When Skylab changed to a "dry workshop" design pre-fabricated on the ground and launched on a Saturn V, the telescope was mounted on a hinged arm and controlled from inside the MDA. Only the octagonal shape of the telescope container, solar panels and the Apollo Telescope Mount name were kept, though there was no longer any association with the LM.
LM Truck
[edit]The Apollo LM Truck (also known as Lunar Payload Module) was a stand-alone LM descent stage intended to deliver up to 11,000 pounds (5.0 t) of payload to the Moon for an uncrewed landing.[52] This technique was intended to deliver equipment and supplies to a permanent crewed lunar base. As originally proposed, it would be launched on a Saturn V with a full Apollo crew to accompany it to lunar orbit and guide it to a landing next to the base; then the base crew would unload the "truck" while the orbiting crew returned to Earth.[53] In later AAP plans, the LPM would have been delivered by an uncrewed lunar ferry vehicle.[54]
Depiction in film and television
[edit]The 1995 Ron Howard film Apollo 13, a dramatization of that mission starring Tom Hanks, Kevin Bacon, and Bill Paxton, was filmed using realistic spacecraft interior reconstructions of the Aquarius and the Command Module Odyssey. In 2013 in the television show Arrested Development, a fictionalized version of Howard is depicted as having the Apollo 11 "LEM" in his office, which his character claims was used to fake the 1969 moon landing.
The development and construction of the lunar module is dramatized in the 1998 miniseries From the Earth to the Moon episode entitled "Spider". This is in reference to LM-3, used on Apollo 9, which the crew named Spider after its spidery appearance. The unused LM-13 stood in during the teleplay to depict LM-3 and LM-5, Eagle, used by Apollo 11.
The Apollo 11 Lunar Module Eagle is depicted in the 2018 film First Man, a biopic of Neil Armstrong.
Media
[edit]-
Neil Armstrong lands the Apollo 11 Lunar Module Eagle on the Moon, July 20, 1969, creating Tranquility Base. Starts approximately 6200 feet from the surface.
-
David Scott lands Apollo 15 Lunar Module Falcon on the Moon on July 30, 1971, seen from the perspective of the Lunar Module Pilot. Starts at approximately 5000 feet from the surface.
-
Apollo 15 Lunar Module Falcon lifts off from the Moon, August 2, 1971. View from TV camera on the Lunar Roving Vehicle.
-
Apollo 15 Lunar Module liftoff. View from inside Falcon.
-
Apollo 17 Lunar Module Challenger liftoffs from the Moon on December 14, 1972. View from TV camera on the Lunar Roving Vehicle.
-
Grumman Aircraft Engineering Corporation manufacturing team with Lunar Module TM-5 ascent stage fuselage.
-
Grumman Aircraft Engineering Corporation manufacturing team with Lunar Module PA-1 ascent stage fuselage.
-
Two Grumman Aircraft Engineering Corporation Lunar Module ascent stage fuselages being moved to final assembly.
-
A Lunar Module ascent stage fuselage being transported from Grumman Aircraft Engineering Corporation Plant 5 facility in Bethpage, Long Island, New York.
-
Equipment location plans (1 of 2)
-
Equipment location plans (2 of 2)
-
Controls plans
-
Landing Gear plans
See also
[edit]- List of crewed lunar lander designs
- LK (spacecraft)
- Lanyue
- Lunar escape systems
- Rolls-Royce Thrust Measuring Rig, the 'Flying Bedstead'
References
[edit]- ^ Moon Race: The History of Apollo DVD, Columbia River Entertainment (Portland, Oregon, 2007)
- ^ Orloff, Richard (1996). Apollo by the Numbers (PDF). National Aeronautics and Space Administration. p. 22. Archived (PDF) from the original on February 22, 2016. Retrieved May 23, 2016.
- ^ "NASA New Start Inflation Indices". National Aeronautics and Space Administration. Archived from the original on June 24, 2016. Retrieved May 23, 2016.
- ^ Dickinson, David (June 14, 2019). "ASTRONOMERS MIGHT HAVE FOUND APOLLO 10'S "SNOOPY" MODULE".
- ^ "Apollo 11 Lunar Orbit Phase". Archived from the original on December 26, 2017. Retrieved July 12, 2017.
- ^ Gatland, Kenneth (1976). Manned Spacecraft, Second Revision. New York: Macmillan Publishing Co. pp. 194–196. ISBN 0-02-542820-9.
- ^ Agle, D.C. (September 1998). "Flying the Gusmobile". Air & Space. Archived from the original on April 3, 2020. Retrieved December 15, 2018.
- ^ "Landing on the Moon, 1966 episode of MIT's Science Reporter". January 20, 2016. Archived from the original on April 15, 2021. Retrieved December 20, 2017 – via YouTube (posted by MIT).
While one astronaut explores the area around the LEM, the second remains inside to maintain communications.
- ^ Ryba, Jeanne, ed. (July 8, 2009). "Apollo 10". NASA. Archived from the original on July 23, 2013. Retrieved June 26, 2013.
- ^ "Current locations of the Apollo Command Module Capsules (and Lunar Module crash sites)". Apollo: Where are they now?. NASA. Archived from the original on July 17, 2011. Retrieved December 27, 2014.
- ^ "New Evidence Suggests Apollo 11's Lunar Ascent Module Could Still Be Orbiting the Moon". Discover Magazine. Retrieved May 20, 2024.
- ^ Teitel, Amy Shira (May 31, 2019). "Lunar Module: How do you land on the Moon?". Astronomy.com. Retrieved September 29, 2021.
- ^ "Aerospace: Grumman in Orbit". Time. November 16, 1962. ISSN 0040-781X. Retrieved September 29, 2021.
- ^ Courtney G. Brooks; James M. Grimwood; Loyd S. Swenson (September 20, 2007). "Chariots for Apollo: A History of Manned Lunar Spacecraft; Engines, Large and Small". Archived from the original on March 1, 2012. Retrieved June 7, 2012.
- ^ "The Canadian Story of the Apollo Lunar Module Landing Legs". July 15, 2019.
- ^ Garcia, Mark (January 18, 2018). "50 Years Ago: The Apollo Lunar Module". NASA. Retrieved December 26, 2022.
- ^ Jones, Bart (July 19, 2019). "Bethpage park honors workers who built Apollo 11 lunar module". Newsday. Retrieved December 26, 2022.
- ^ Leary, Warren E. (March 27, 2002). "T. J. Kelly, 72, Dies; Father of Lunar Module". The New York Times. Archived from the original on June 23, 2017. Retrieved February 18, 2017.
- ^ a b c Remembering the Giants - Apollo Rocket Propulsion Development - NASA. NASA. pp. 73–86.
- ^ "LM Electrical". Encyclopedia Astronautica. Archived from the original on February 1, 2010.
- ^ "LM Landing Gear". Encyclopedia Astronautica. Archived from the original on February 1, 2010.
- ^ "SP-4402 Origins of NASA Names". NASA History. NASA. Archived from the original on December 4, 2016. Retrieved January 16, 2015.
- ^ Scheer, Julian W. (Assistant Administrator for Public Affairs, NASA). Memorandum from Project Designation Committee, June 9, 1966.
- ^ Cortright, Edgar M. (1975). Apollo expeditions to the moon. Scientific and Technical Information Office, National Aeronautics and Space Administration. NASA.gov ch-4-2 Archived April 28, 2021, at the Wayback Machine.
- ^ Grissom, Gus (February 1963). "The MATS Flyer Interviews Major Gus Grissom". The MATS Flyer (Interview). Interviewed by John P. Richmond Jr. Military Air Transport Service, United States Air Force. pp. 4–7. Archived from the original on July 26, 2020. Retrieved June 28, 2020.
- ^ "LLRV Monograph". Archived from the original on December 25, 2017. Retrieved July 12, 2017.
- ^ Courtney G. Brooks; James M. Grimwood; Loyd S. Swenson (1979). "Chapter 12 Part 7". Chariots for Apollo: A History of Manned Lunar Spacecraft. NASA. ISBN 0-486-46756-2. Archived from the original on February 9, 2008. Retrieved January 29, 2008.
- ^ McDivitt, James A. (May 1971), "6. Trajectory", Apollo 14 Mission Report, NASA, archived from the original on August 5, 2011, retrieved September 24, 2012
- ^ "TR-201 for Delta rocket second stage derived from LMDE". 1972. Archived from the original on July 6, 2008.
- ^ "American Spacecraft | LTA-1". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ "American Spacecraft | LTA-3A". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ "American Spacecraft | LTA-3DR". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ "American Spacecraft | LTA-5". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ a b "Lunar Module LTA-8". Space Center Houston. Archived from the original on April 9, 2018. Retrieved April 9, 2018.
- ^ "American Spacecraft | LTA-8". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ "American Spacecraft | MSC-16". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ "American Spacecraft | TM-5". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ "American Spacecraft | Lunar Modules". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ Maksel, Rebecca, What's real and what's not? Air & Space, June/July 2013, pp. 20-21
- ^ "American Spacecraft | LM-2". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ "Astronomers Might Have Found Apollo 10's "Snoopy" Module". Sky & Telescope. June 14, 2019. Archived from the original on May 19, 2021. Retrieved September 14, 2021.
- ^ "New Evidence Suggests Apollo 11's Lunar Ascent Module Could Still be Orbiting the Moon". Archived from the original on August 22, 2021. Retrieved August 22, 2021.
- ^ "American Spacecraft | LM-9". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ "Grumman Lunar Module LM-13 at the Cradle of Aviation Museum". www.cradleofaviation.org. Archived from the original on June 20, 2020. Retrieved June 30, 2020.
- ^ 1971 NASA Authorization: Hearings, Ninety-first Congress, Second Session, on H.R. 15695 (superseded by H.R. 16516) United States. Congress. House. Committee on Science and Astronautics. U.S. Government Printing Office. 1970. p. 887. Archived from the original on June 30, 2020. Retrieved June 30, 2020.
- ^ "American Spacecraft | LM-13". www.american-spacecraft.org. Retrieved May 28, 2023.
- ^ United States. Congress. House. Committee on Science and Astronautics 1970, p. 834.
- ^ a b Mosher, Dave (October 16, 2019). "NASA isn't sure what happened to one of its last Apollo moon landers. The truth is probably depressing". Business Insider. Archived from the original on July 3, 2020. Retrieved June 29, 2020.
- ^ 1970 NASA Authorization: Hearings, Ninety-first Congress, First Session, on H.R. 4046, H.R. 10251 (superseded by H.R. 11271) United States. Congress. House. Committee on Science and Astronautics. U.S. Government Printing Office. 1969. pp. 1127–1128. Archived from the original on July 26, 2020. Retrieved June 30, 2020.
- ^ United States. Congress. House. Committee on Science and Astronautics 1969, p. 1021.
- ^ "Location of Apollo Lunar Modules". Smithsonian National Air and Space Museum. Archived from the original on July 5, 2016. Retrieved June 29, 2020.
- ^ APOLLO NEWS REFERENCE - LUNAR MODULE DERIVATIVES FOR FUTURE SPACE MISSIONS (PDF). Grumman.
- ^ Apollo LM Truck on Mark Wade's Encyclopedia Astronautica Archived December 15, 2005, at the Wayback Machine – Description of adapted LM descent stage for the uncrewed transport of cargo to a permanent lunar base.
- ^ APOLLO NEWS REFERENCE - LUNAR MODULE DERIVATIVES FOR FUTURE SPACE MISSIONS (PDF). Grumman.
Further reading
[edit]- Kelly, Thomas J. (2001). Moon Lander: How We Developed the Apollo Lunar Module (Smithsonian History of Aviation and Spaceflight Series). Smithsonian Institution Press. ISBN 1-56098-998-X.
- Baker, David (1981). The History of Manned Space Flight. Crown Publishers. ISBN 0-517-54377-X
- Brooks, Courtney J., Grimwood, James M. and Swenson, Loyd S. Jr (1979) Chariots for Apollo: A History of Manned Lunar Spacecraft Archived October 20, 2015, at the Wayback Machine NASA SP-4205.
- Haeuplik-Meusburger S. (2011). Architecture for Astronauts. An Activity-based Approach. Springer. [1] ISBN 978-3-7091-0666-2
- Pellegrino, Charles R. and Stoff, Joshua. (1985) Chariots for Apollo: The Untold Story Behind the Race to the Moon. Atheneum. ISBN 0-689-11559-8 (This is not the NASA history series book of the same base title, above, but a totally unrelated work.)
- Sullivan, Scott P. (2004) Virtual LM: A Pictorial Essay of the Engineering and Construction of the Apollo Lunar Module. Apogee Books. ISBN 1-894959-14-0
- Stoff, Joshua. (2004) Building Moonships: The Grumman Lunar Module. Arcadia Publishing. ISBN 0-7385-3586-9
External links
[edit]- NASA Lunar Module Documentation Lunar Surface Journal
- Google Moon overview of Apollo landing sites
- NASA catalog: Apollo 14 Lunar Module
- Demonstration of the Lunar Excursion Module and explanation of its systems (1966, Thomas Kelly at Grumman plant on Long Island, episode of Science Reporter, MIT film posted to YouTube)
- Space/Craft Assembly & Test Remembered – A site "dedicated to the men and women that designed, built and tested the Lunar Module at Grumman Aerospace Corporation, Bethpage, New York"
- We Called It 'The Bug', By D.C. Agle, Air & Space Magazine, September 1, 2001 - Overview of LM descent
- Apollo 11 LM Structures handout for LM-5 (PDF) – Training document given to astronauts which illustrates all discrete LM structures
- Apollo Operations Handbook, Lunar Module (LM 10 and Subsequent), Volume One. Subsystems Data (PDF) Manufacturers Handbook covering the systems of the LM.
- Apollo Operations Handbook, Lunar Module (LM 11 and Subsequent), Volume Two. Operational Procedures Manufacturers Handbook covering the procedures used to fly the LM.
- Apollo 15 LM Activation Checklist for LM-10 – Checklist detailing how to prepare the LM for activation and flight during a mission
- Lunar module launch video
Games
[edit]- Perilune 3D Procedural Lunar Lander Simulation
- Lander On-line 2D Lunar Module Landing Simulation Game
- Easy Lander 3D Lunar Module Landing Simulation Game